NOTES FROM THE CRUISE AT R/V “BELGICA”. CONTINUATION

  • October 08, 2021

“Very raw weather conditions namely wind and waves cause that our cruise is behind the schedule running with a speed maximum 6-7 knots. We already did two additional stations (in total, 3 done) with the same parameters as it was done at the first station.  It looks that sediment sampling will take place in the Mediterranean sea where more calm weather conditions are expected”.

Figure 1. The work is in full swing at the R/V “Belgica”

To date, our ship has already approached the Strait of Gibraltar (Figure 2).

Figure 2. The current position of the R/V “Belgica” established via satellite